Owner
Wood County Hospital
Construction Manager
Turner Construction
Architect
DesignGroup
Completion Date
June, 2013 (expected)
Construction Cost
$5 million

BGSU Student Health Service provides accessible, caring, high-quality, confidential, cost-effective health care services to a diverse student population. The Student Health Service strives to be the health care provider of choice for all BGSU students and to be the nationwide model of a successful, quality student health service. Wood County Hospital collaborated with BGSU to build the Falcon Health Center. This project is a 20,000 square foot, two story Health Center that will serve the future medical needs of the students.

The project was awarded to the design build team in October 2012. The building will open in time for Fall Semester to start in August 2013. To meet this schedule, the team quickly identified the critical path components in the building. Structural steel was identified as the main component that had to be on schedule for the building to open on time. The schedule would require that structural steel design would be done at the same time that the building was being designed. This required the team to make quick, decisive decisions about the floor plan and locations of the main structural components so that steel design could be completed. To meet the schedule, the steel was designed in two stages. The main building frame was issued five weeks after programming was completed. The foundation drawings were issued a week later and the balance of the structural steel framing, which consists of items that required coordination with MEP and architectural design, were issued three weeks after the main frame was issued.

Site construction began January 2013 with an on time completion expected in August 2013.