The Ohio State University - South Campus Central Chiller Plant

The Ohio State University - South Campus Central Chiller Plant

Columbus, OH

Owner
The Ohio State University
Construction Manager
The Whiting-Turner Contracting Company
Architect
Champlin Architecture/Ross Barney Architects
Completion Date
2012
Construction Cost
$52 million
Certification
LEED Silver

The South Campus Central Chiller Plant provides chilled water to support critical functions and operating rooms throughout the OSU medical campus including the new Critical Care Tower. The 3 story building stands 125 feet above grade and includes a basement built in the flood plain and designed as an inverted bathtub to ensure the equipment remains dry and functioning. A 35 foot screen wall at the top of the building conceals cooling towers. This project was a trial for the construction reform law in Ohio and utilized the Design Assist method. Through this delivery method, we were able to coordinate with the steel and precast fabricator much earlier in the project. This additional early coordination resulted in innovative precast connections and panel design that reduced the steel tonnage required to support the cladding. The structure was required to support very large equipment and piping loads including chillers weighing 127,000 pounds each, cooling towers weighing 121,000 pounds and 42” diameter pipes. Extensive coordination was required to properly support the equipment and allow user flexibility in the future while keeping structure costs within budget.