• Skip to main content
  • Skip to footer
  • Home & Blog
  • About Us
    • About Us
    • Our History
    • Our Team
    • Services
    • States SMBH is Registered for Work
    • AIA Continuing Education Provider
  • Portfolio
    • Civic Projects
    • Commercial Projects
    • Higher Education Projects
    • Pre K-12 Education Projects
    • Healthcare Projects
    • Hospitality & Residential Projects
    • Manufacturing & Industrial Projects
    • Recreational Projects
    • Religious Projects
    • Retail Projects
  • Employment
  • Contact Us

SMBH

A creative culture of passionate people engaged in innovative structural design.

Broad Street United Methodist Church Stone Replacement

BroadSt UnitedMethSE

Broad Street United Methodist Church Stone Replacement

Location:
Columbus, Ohio

Architect:
Rogers Krajnak Architects, Inc.

Construction Cost:
$1.5 million

 

Built in 1885, this gothic revival style church with Victorian influences was built with serpentine stone facade. The stone is a gorgeous building material with rich veining and flecks of mica, but is very porous. The church was experiencing water infiltration and spalling which had been patched with stone mortar, but many of these repairs only furthered the deterioration of the stone.

The decision was made in 2006 to remove and replace the serpentine stone with a new, synthetic cast stone designed to replicate the color, size, and texture of the original. Because the church is listed on the National Register of Historic Places, the stone replacement needed and received unanimous approval from the City’s Historic Resources Commission.

The original exterior walls were constructed of several layers of brick interconnected in a dovetail manner with the serpentine stone. The painstaking process to remove the serpentine stone on the exterior while minimizing cracks on the interior plaster included the installation of steel braces and needle beams. The original serpentine stone was methodically removed in small sections exposing the brick within the wall. New cast stone was installed in small sections anchored with stainless steel connectors and mortared in place. Subsequent sections of serpentine stone were removed followed by the installation of sections of new cast stone in multiple sequences until the stone replacement on each façade complete.

The project also included cleaning and repairing other sandstone and limestone elements including the existing sills, lintels, columns and watertable. The wood windows and pressed metal trim were painted. Various Victorian elements that were lost over the years due to weather and neglect were repaired or replicated to complete the project.

 

Awards:

  • 2009 Ohio Historic Preservation Office Award
  • 2008 James B Recchie Design Award Finalist

July 17, 2020 Filed Under: Award Winning, Religious

Footer

Our Office

614.481.9800

info@smbhinc.com

1166 Dublin Rd
Suite 200
Columbus, Ohio 43215

Search

Find Us on Social Media

Handcrafted with on the Genesis Framework