• Skip to main content
  • Skip to footer
  • Home & Blog
  • About Us
    • About Us
    • Our History
    • Our Team
    • Services
    • States SMBH is Registered for Work
    • AIA Continuing Education Provider
  • Portfolio
    • Civic Projects
    • Commercial Projects
    • Higher Education Projects
    • Pre K-12 Education Projects
    • Healthcare Projects
    • Hospitality & Residential Projects
    • Manufacturing & Industrial Projects
    • Recreational Projects
    • Religious Projects
    • Retail Projects
  • Employment
  • Contact Us

SMBH

A creative culture of passionate people engaged in innovative structural design.

Columbus City Schools Columbus Scioto 6-12 School

CCS - Columbus Scioto 6-12 School

Columbus Scioto 6-12 School

Columbus City Schools

Location:
Columbus, Ohio

Architect:
DesignGroup

Construction Cost:
$13.5 million

Project Size:
72,550 SF

Designed to meet the needs of emotionally disturbed students, the new Columbus Scioto 6-12 School prepares young men and women to successfully achieve the goal of graduating from Columbus City Schools. These students, formerly housed in two separate facilities (Alum Crest High School and Clearbrook Middle School), are now brought together in an atmosphere of educational stimulation that is emotionally calming for the student population. The 72,550 square foot facility which serves 250 students, is located near the Scioto River on the city’s south side.

The structure, designed in accordance with the Ohio School Facilities Commission (OSFC) design manual, includes site and building amenities developed for the special student population and numerous sustainable features. Some of the design features include a Geothermal heating and cooling system to reduce energy consumption, a North/South long axis building orientation, roof monitors and a main entry spine with clerestory windows to maximize daylight in the building.

The two-story building utilizes exterior and interior masonry bearing walls and structural steel that support a precast concrete floor system and a structural steel roof system. The numerous large exterior windows presented structural challenges that required careful coordination with the architectural design to maintain enough bearing wall between the windows. The roof monitors also required careful coordination with the design of the building.

March 20, 2018 Filed Under: Award Winning, Columbus City Schools, Education Pre K-12

Footer

Our Office

614.481.9800

info@smbhinc.com

1166 Dublin Rd
Suite 200
Columbus, Ohio 43215

Search

Find Us on Social Media

Handcrafted with on the Genesis Framework