This new high school for Groveport Madison Local School District was built on the same grounds as the school it was replacing. The 250,000 SF high school included two gymnasiums, one auditorium, and classroom wings extending up to two stories. The roof combines cold-formed metal trusses and steel joists supporting a metal deck. Steel beams and columns are used in conjunction with concrete masonry-bearing walls to transfer the weight of the building into standard shallow footings.