• Skip to main content
  • Skip to footer
  • Home & Blog
  • About Us
    • About Us
    • Our History
    • Our Team
    • Services
    • States SMBH is Registered for Work
    • AIA Continuing Education Provider
  • Portfolio
    • Civic Projects
    • Commercial Projects
    • Higher Education Projects
    • Pre K-12 Education Projects
    • Healthcare Projects
    • Hospitality & Residential Projects
    • Manufacturing & Industrial Projects
    • Recreational Projects
    • Religious Projects
    • Retail Projects
  • Employment
  • Contact Us

SMBH

A creative culture of passionate people engaged in innovative structural design.

North High Complex

246 N high 35 E chestnut 2_ North High Complex

North High Complex

Location:
Columbus, Ohio

Architect:
Maddox NBD & Acock Associates

Construction Cost:
$46 million

Project Size:
Approximately 800,000 SF

The State of Ohio purchased an office building complex at the corner of High Street and Chestnut Street in downtown Columbus to house various state agencies. The original building on the site, immediately adjacent to Chestnut and High, was constructed in the early part of the 20th century. In the late 1940s, a 10-story addition was constructed on High Street, south of the original building. The building at 35 East Chestnut was constructed east of the original building and across Pearl Alley during the 1960s.

The State of Ohio has undertaken a major renovation of the complex in order to modernize mechanical, electrical and plumbing systems with the goal of extending the useful life by 40 years. We prepared structural analysis calculations to verify the live load capacity of floors and roofs and determine the impact of cutting new openings in them. During the construction phase, some severely deteriorated structural elements were uncovered, and we quickly prepared designs to repair the damage so as not to impact the construction schedule significantly.

A thorough investigation of the building façade also was an essential component of the revitalization process. After examining the exterior surfaces and noting unusual cracking and displacement, we determined that removal of selected portions of the brick and stone façade was necessary in order to examine the supporting steel shelf angles and ties. We prepared a plan for examination and supervised removal of selected façade panels so we could closely examine the steel. We subsequently designed repairs involving removal and replacement of corroded shelf angles and anchors.

Delivery methods have been General Contracting and Multiple Prime.

March 20, 2018 Filed Under: Commercial