Nationwide Children’s Hospital Research Building 3
Location: Columbus, Ohio Architect: NBBJ Construction Cost: $80 million Project Size: 235,000 SF Nationwide Children’s Hospital in Columbus, Ohio, values itself as being a place where a child can receive the best care anywhere in the world. The hospital says it’s “the place where curing and caring go hand-in-hand.” It’s a mission important to the…
Read MoreFairfield Medical Center Surgery Addition
Location: Lancaster, Ohio Architect: DesignGroup Construction Cost: $27 million Project Size: 80,000 SF The project is a new two-story building with a basement that functions as a surgery and patient room addition located between the main hospital and the existing pavilion surgery building. The basement encompasses 16,000 square feet, the first-floor surgery is 28,600 square…
Read MoreDiley Ridge Medical Center
Location: Canal Winchester, Ohio Architect: DesignGroup Construction Cost: $17.5 million Project Size: 66,000 SF LEED Certification: LEED Gold Certified The new Diley Ridge Medical Center is a joint venture of Mount Carmel Health System and Fairfield Medical Center. It is the first free-standing emergency and diagnostic center in central Ohio. Built to fill the void…
Read MoreWest Virginia University Mary Babb Randolf Cancer Center
Location: Morgantown, West Virginia Architect: Stantec Construction Cost: $17.3 million Project Size: 86,300 SF As West Virginia’s most comprehensive cancer treatment, research, and education facility, the Mary Babb Randolph Cancer Center needed to enlarge its facility to accommodate increasing patient levels. This expansion project doubled patient care space and included a new tunnel and partial…
Read More