SMBHLogo_RGB Transparent

Blog Archives

  • Ohio University Porter Hall

    Oct 1, 2018

    Location: Athens, Ohio Architect: RVC Architects Construction Cost: $16.05 million Built in 1959, the five-story building was initially used for Botany, Geography, Geology, and Psychology departments. Major renovations and repairs were made to the building in 1993, and it reopened in 1994. It contains classrooms, computer labs, a health clinic, a headache clinic, faculty and…

  • Ohio University McGuffey Hall

    Oct 1, 2018

    Location:Athens, Ohio Construction Cost:$800,000 McGuffey Hall is one of the original buildings on the campus of Ohio University in Athens, Ohio. Ohio University wanted to preserve the outward appearance of this building but update the interior spaces to accommodate a large meeting room on the lowest level for the Board of Trustees. Headroom in the…

  • Ohio University McCracken Hall

    Oct 1, 2018

    Location: Athens, Ohio Architects: RVC Architects Champlin Architecture LEED Certification: LEED Certified Construction Cost: $32.8 million Project Size: 109,000 SF McCracken Hall is a landmark for the Gladys W. and David H. Patton College of Education at Ohio University in Athens, Ohio. The three-story, 66,600 SF structure was initially constructed in 1959. While minor structural…

  • Ohio University Alden Library

    May 9, 2018

    Location: Athens, Ohio Architect: DesignGroup Construction Cost: $500,000 Project Size: 30,000 SF This renovation project combined the Ohio University Center for Teaching and Learning, Inter-Library Loan, Graphics Services, and Copy Services.  New windows were added to the exterior wall to provide natural light for the spaces.

  • Hanover College Outdoor Athletic Improvements

    May 9, 2018

    Location: Hanover, Indiana Architect: SPGB Architects, LLC Construction Cost: $800,000 This project included the construction of baseball, softball, and soccer concession stands and press boxes.  All three of these two-story buildings were designed with load-bearing masonry walls, wood floor joists, and wood roof trusses.

  • Hanover College Alumni Stadium Renovation

    May 9, 2018

    Location: Hanover, Indiana Architect: SPGB Architects, LLC Construction Cost: $3.7 million Project Size: 27,000 SF The project consisted of a renovation and addition to the existing Hanover College football stadium. A new 27,000 SF, three-story addition that includes new locker rooms, training rooms, and a press box was added to the west side of the…

  • Hanover College Brown Campus Center Dining Hall

    May 9, 2018

    Location: Hanover, Indiana Architect: SPGB Architects, LLC Construction Cost: $800,000 Project Size: 7,600 SF The project involved renovating the existing dining facilities within the J. Graham Brown Campus Center. The renovations included modifications to the existing floor plan, including the addition of openings, removal of partitions, the addition of a folding partition wall, the addition…

  • Hanover College Lynn Hall Renovation

    May 9, 2018

    Location: Hanover, Indiana Architect: SPGB Architects, LLC Construction Cost: $4  million Project Size: 27,000 SF This project was renovating the existing building from a gymnasium into an integrated live-learning residence hall. The renovated structure provides 72 beds for student housing, two large multi-purpose classrooms, academic support offices, overnight guest lodging, and campus storage space.

  • Portsmouth City Schools Portsmouth Downtown Elementary

    May 3, 2018

    Location: Portsmouth, Ohio Architect: TSHD Architects Construction Cost: $22.8 million Project Size: 161,536 SF The Elementary houses 1,000 students in a 161,536 SF building. The facility is multi-story, with the older students on the upper floor and the younger students on the ground level. Common spaces such as the cafetorium and gymnasium are adjacent to…

  • Portsmouth City Schools Portsmouth Junior / Senior High School

    May 3, 2018

    Location: Portsmouth, Ohio Architects: TSHD Architects and Fanning Howey Construction Cost: $25.2 million Project Size: 182,500 SF Awards: School Planning & Management’s Education Grand Prize Award Portsmouth City Schools passed a bond issue to construct a new Junior/Senior High School to update their facilities and accommodate their growing population. This project was one of three…